Newly Renovated with RM 52.7 facelift Puduraya Bus Terminal Leaking
The 36-year-old Puduraya Bus Terminal was opened on 16 April 2011 after undergoing massive renovations costing RM52.7mil.
The opening was delayed several times due to additional work on the base of the building.
On Monday 9 April 2011, water was found to leaking from the roof of the newly renovated Puduraya Bus Terminal, however The Star newpaper reported on May 12, 2011 that "Puduraya is not leaking"
Refer the link to The Star news reporting on May 12, 2011
http://thestar.com.my/metro/story.asp?file=/2011/5/12/central/8662574&sec=central
The 33-second footage recorded by a passenger on Monday evening was posted on Facebook.
It showed two sprinkler system with water gushing out.
Two garbage bins were used to contain the water.
The footage posted in the social networking site Facebook and Twitter sparked a myriad of reactions ranging from amusement to anger and sarcasm.
The footage of the video posted in the Facebook is posted for the reader to view and decide for themself whether there is a water leakage or not.
No comments:
Post a Comment